Photovoltaic systems Between Hadsten, Hadbjerg and Nørre Galten

Welcome to the info page for the solar plant
between Hadsten, Hadbjerg and Nørre Galten

This page shows the latest status of the project. The development of a renewable energy project is a dynamic process where changes can occur continuously, partly based on local and municipal dialog. Therefore, project-specific information may change during the development and planning process.

Below Timeline and Status you can see the latest updates on the project.

About the project

The gross area of the project is approximately 300 hectares. The project area is located in open land between Nørre Galten, Hadsten and Hadbjerg. 

The project includes a ground-based photovoltaic system with the possibility of installing solar modules corresponding to an annual power production of approximately 270,000 MWh. 

When delimiting the area, it has been emphasized that the facility constitutes a single unit and that distance to neighbors located in the immediate vicinity of the project area is ensured.

Greater consistency and accessibility

This is the preliminary layout plan of the project. The layout plan shows the different elements within the project area. The layout plan has been prepared based on local input, municipal dialog and consideration for the internal and surrounding nature and environment.

Gross area

approx. 306 ha

Production

approx. 270,000 MWh

solarAREAL

approx. 248 ha

windbreak

approx. 12 KM

Path

approx. 15 KM

area kept free

approx. 58 ha

Visualizations

A series of preliminary visualizations of the project have been made from five photo points in the area.

NOTE: The visualizations are based on a previous project layout, which has been updated after the concept consultation. See the previous project layout here.

The photos were taken with a focal length of 35 mm and the photo points are shown on the map here.

The installation is visualized with 3.5 meter high south-facing panels and surrounding vegetation with a height of 4 meters.

The visualizations were made at an early stage of the project development. Possible inner planting belts and passages through the facility are not included.

Photo point 1

From Hadbjergvej towards northeast

photo point1-beforephoto point1-after

Photo point 2

From Hadbjergvej towards northeast

photo point 2 beforephoto point2-after

Photo point 3

From Kærsmindevej towards northwest

photo point3-beforephoto point3-after

Photo point 4

From Erslevvej towards south

photo point4-beforephoto point4-after

Photo point 5

From Galten Hedevej towards north

photo point5-beforephoto point5-after