Photovoltaic systems by Løgumkloster

Welcome to the info page for the solar plant
at Løgumkloster

This page shows the latest status of the project. The development of a renewable energy project is a dynamic process where changes can occur continuously, partly based on local and municipal dialog. Therefore, project-specific information may change during the development and planning process.

Below Timeline and Status you can see the latest updates on the project.

About the project

The gross area of the project is approximately 69 hectares. Of this, the area for solar cells is approx. 63 ha. The project area is located in open countryside southeast of Løgumkloster in Tønder Municipality. 

The project includes a ground-mounted photovoltaic system and a battery system for storing the energy produced (BESS). It allows for the installation of solar modules corresponding to an annual power production of up to 75,000 MWh.

When delimiting the area, it is important that the facility forms a single unit and that distance to neighbors is ensured.

Greater consistency and accessibility

This is the preliminary layout plan of the project. The layout plan shows the different elements within the project area. The layout plan has been prepared based on local input, municipal dialog and consideration for the internal and surrounding nature and environment.

Gross area

approx. 69 ha

Production

up to 75,000 MWh

solarAREAL

approx. 63 ha

windbreak

approx. 3.5 KM

Path

approx. 3.5 KM

area kept free

approx. 3 ha

Visualizations

A series of preliminary visualizations of the project have been made from seven photo points in the area.

The photos were taken with a focal length of 35 mm and the photo points are shown on the map here.

The installation is visualized with 3.5 meter high south-facing panels and surrounding vegetation with a height of 3.5 meters.

The visualizations have been selected in collaboration with Tønder Municipality to illustrate the visual impact of the project from selected locations.

Photo point 1

From Dravedvej towards northeast

P1P1_Planting

Photo point 2

From Stationsvej towards south

P2P2_Planting

Photo point 3

From Jørgensgaardvej towards south

P3P3_Planting

Photo point 4

From Krusåvej towards southwest

P4P4_Planting

Photo point 5

From Assetvej towards north

P5P5_Planting

Photo point 6

From Assetvej/Dravedvej towards north

The plant will not be visible from this visualization point. The location of the panels is therefore visualized with a transparent red line.

Photo point 6 existing conditionsP6_PV

Photo point 7

From field road between Dravedvej and Galgebakkevej towards northeast

The plant will not be visible from this visualization point. The location of the panels is therefore visualized with a transparent red line.

P7P7_PV